Bitumen does not flow. To move it by pipeline, producers blend it with a light diluent, mostly condensate, until about 30% of the barrel is diluent. Alberta used 781,000 b/d of pentanes plus in 2025 and produced 425,000 b/d. The other 357,000 b/d came from BC and the US. Verified
Canada is now planning the pipes to grow the oil sands: Trans Mountain and Enbridge expansions, South Bow’s revival of Keystone XL, and Pacific Link, which Ottawa named its first national interest project on 1 October. Verified None of them brings diluent back. We built the full balance and our own year-by-year forecast, including every sanctioned LNG plant and Ksi Lisims, and set out what it would take to bring the diluent in, who pays, and who can act.
In 60 seconds
- The gap is growing on its own: 357 kb/d today, 430 kb/d by 2031 on the AER’s forecast, which assumes less than half the past decade’s oil sands growth.
- Every new oil export pipe is a diluent customer. About 1.1 mb/d could open by 2030, and the AER fills only about half of it; Pacific Link alone would need 300 kb/d.
- With every oil export pipe full and all LNG projects running, Ksi Lisims included, Alberta would need about 555 kb/d of diluent from outside, 55% more than today: about C$18 billion a year at 2025 prices, against C$11.5 billion now.
- Two waves. At the historical growth pace, Alberta needs about 70 kb/d of diluent beyond today’s import capacity in 2029, before the LNG gas flows, and about 150 kb/d by 2037 as Pacific Link fills.
- Gas helps only if it is rich. Even on the AER’s generous yield, closing the gap with gas takes about two more LNG Canada-sized plants beyond Ksi Lisims, C$65 billion or more of investment; at Alberta’s current average ratio, almost five.
- No single fix, and none is easy. Rail, diluent recovery and splitters can bridge to 2030; a lasting fix needs pipe that brings diluent north, and producers must sign for it. If nothing is built, price rations diluent, growth slows, and Pacific Link, the last to open, runs part-full.
- Who moves first. Enbridge holds the fastest pipe fix, Shell the biggest supply lever, and SAGD producers the contracts that make either bankable. Our six calls are in Section IX.
Alberta Already Brings In 357,000 Barrels a Day
Alberta’s condensate output grew 7.2% in 2025 on liquids-rich drilling, but demand grew from a much larger base. The AER sees the shortfall reaching 430 kb/d in 2031 and staying above 410 kb/d to 2035. Verified Most of the gap comes from the US through two pipelines from the Chicago area that run at or near capacity; the rest comes from BC’s Montney and by rail. Reported At 2025 prices, that is about C$11.5 billion a year of diluent bought from outside Alberta. Estimate
How to read it → Red line: demand. Green line: Alberta’s own supply. The shaded area is the gap that must be brought in; the grey panel is the AER’s forecast.
Why it matters → Demand follows bitumen output; supply follows liquids-rich drilling, which grows more slowly. The gap widens even before the new pipes.
| Source | kb/d | How it gets there |
|---|---|---|
| Alberta’s own pentanes plus | 425 | Montney and Duvernay gas plants, by pipeline to Edmonton and Fort Saskatchewan |
| United States, by pipeline | 260–290 | Two lines from the Chicago area, supplied from the US Midwest and Gulf Coast; running at or near capacity |
| BC and rail | ~65–95 | The rest of the gap: BC Montney condensate by pipeline, and US barrels by rail |
| Total pentanes plus used | 781 | Mostly blended into non-upgraded bitumen |
| Butane blended | ~124 | Alberta’s own LPG, blended up to pipeline vapour-pressure limits, mostly because it is cheaper than crude |
| All diluents, Western Canada | ~900 | Condensate and other light hydrocarbons |
Every New Oil Export Pipe Is Also a Diluent Customer
About 1.1 mb/d of new oil export pipe could open by 2030: Trans Mountain’s optimization (420 kb/d), Enbridge’s first Mainline phase (150 kb/d), Express-Platte (30 kb/d) and, if it proceeds, South Bow’s Prairie Connector, 465 kb/d at the end of 2028 and expandable beyond 800 kb/d with more pumping. Reported Enbridge postponed its 250 kb/d second phase in August for lack of producer commitments. Reported Pacific Link, 1 mb/d to Roberts Bank near Vancouver, would follow in the early 2030s. Filled with diluted bitumen, every 1 mb/d of pipe needs about 300 kb/d of diluent, about C$10 billion a year at 2025 prices. Estimate
| Pipeline | kb/d | Start | Status | In AER forecast? | Diluent if full, kb/d |
|---|---|---|---|---|---|
| Express-Platte expansion | 30 | 2026 | Under way | Yes | 9 |
| Enbridge Mainline, phase 1 | 150 | 2027 | Planned | Yes | 45 |
| Enbridge Mainline, phase 2 | 250 | Postponed | Deferred Aug 2026 for lack of producer commitments | Yes | 75 |
| Trans Mountain optimization, incl. Puget Sound | 420 | 2030 | Planned | Yes | 126 |
| Prairie Connector (Keystone XL revival) | 465 | End-2028 (company target) | Expandable to 800+; 465 kb/d of 20-year commitments; FID mid-2027; needs a durable permit | No | 140–240 |
| Pacific Link | 1,000 | Early 2030s | National interest project; construction targeted from Sep 2027; not yet approved | No | 300 |
How fast they fill depends on growth. The AER’s forecast adds about 46 kb/d of bitumen a year to 2035 and fills about 0.55 mb/d of new pipe by 2031. Over the past decade the oil sands grew about 120 kb/d a year; at that pace the pipe ahead of Pacific Link fills by about 2031, close to Enverus’s view, and Pacific Link by about 2037. Estimate And all of the planned growth is bitumen that needs diluent, as no material upgrader expansions are planned. Interpretation
How to read it → Navy: actual output. Grey dashes: the AER’s forecast. Gold dashes: the past decade’s pace continued. Red dotted lines: the output needed to fill the pipes; the dots mark when the gold line reaches them.
Why it matters → At the historical pace the pipes before Pacific Link fill by about 2031 and Pacific Link by about 2037. On the AER’s path, neither fills by 2035.
With Every Export Pipe Full: About 555,000 Barrels a Day
We start from the AER’s 430 kb/d in 2031, add about 150 kb/d for the pre-Pacific Link pipe the AER does not count and 300 kb/d for Pacific Link, then subtract the condensate from the incremental gas production needed to meet new demand: LNG Canada’s second phase, Ksi Lisims (assumed sanctioned), Woodfibre, Cedar, Meta’s data-centre campus and fuel for the new SAGD barrels, about 5.6 Bcf/d in all. Estimate
How to read it → Read from top to bottom: start from today’s shortfall, add what each new oil export pipe needs, subtract the condensate from gas produced for new demand. Solid bars are the central case; whiskers show the range from the richest gas to dry gas.
Why it matters → New gas offsets only part of the new pipes, even in the central case. The rest has to be brought in.
On the AER’s own yield, Alberta would still need to bring in about 555 kb/d of diluent, a 55% increase from today’s import volume and about C$6.4 billion a year more at 2025 prices. If all the new gas were as rich as the best Montney wells it would be about 455; if dry, 880. Estimate Without Pacific Link the central figure is about 305 kb/d, within today’s diluent import capacity: Pacific Link turns a manageable gap into a structural one. Interpretation
Rystad Energy sees the same shape: its high case, with an Alberta–BC pipe and further Mainline phases, implies a shortfall of about 383 kb/d on top of today’s imports; its base case is tightly balanced. Reported Our extra shortfall, about 200 kb/d, sits between the two because we count the condensate from LNG demand. Interpretation
The Squeeze Comes in Two Waves
We modelled the balance year by year to 2038. Demand follows bitumen output, on the AER’s path or at the past decade’s 120 kb/d a year, capped by the pipe actually open. Supply is the AER’s forecast plus condensate from each new gas customer at 58 barrels per MMcf (37–77 as the range), with gas for each LNG plant flowing a year early. The zero line is today’s diluent import capacity, about 357 kb/d. Estimate
How to read it → Each line is the diluent Alberta must bring in above today’s ~357 kb/d. Navy: growth at the past decade’s pace with the pipes before Pacific Link. Red: the same plus Pacific Link from 2032, with the shaded band from Alberta’s average yield (top) to the richest wells (bottom). Grey dashes: the AER’s growth path. Right-hand labels convert kb/d into daily 120-car trains from Texas.
Why it matters → Timing matters as much as size: the hardest years come before the LNG gas flows, when only rail and diluent recovery can respond.
Three findings. The squeeze starts now: even on the AER’s path, Alberta needs about 20 kb/d beyond today’s capacity in 2026–28. It peaks first in 2029, when the oil export pipes fill before gas for LNG Canada’s second phase and Ksi Lisims flows: about 70 kb/d, or 90 at Alberta’s average yield, one to one and a half unit trains a day from Texas. LNG then brings relief until Pacific Link fills, and the requirement climbs back to about 75 kb/d by 2035 and 150 kb/d by 2037, or 260 at the average yield. Estimate These figures sit below the static balance because the AER expects Alberta’s own condensate output to keep rising after 2031.
Could producers outrun the squeeze by drilling for condensate? Alberta’s output rose about 24 kb/d a year over the past decade, and our central case already has it growing about 40 kb/d a year to 2035, because it adds the condensate from LNG demand. Estimate The limit is the gas: every liquids-rich well brings gas that needs a buyer, and until LNG demand arrives it has nowhere to go but an oversupplied Alberta market (Article 50). Interpretation On the AER’s slower path, LNG closes the gap after 2030; Enbridge says producers will not commit to new pipe until policy is settled. Reported That may be close: the five largest oil sands producers are negotiating a binding growth agreement with Ottawa and Alberta, and Enbridge said on 6 November that it sees “the cusp of a huge cyclical” growth wave. Reported If the agreement is signed, we expect growth nearer the historical pace. Interpretation
At Least Two More LNG Canadas, After the Pipes
Whether gas can close the gap depends on how rich the new gas is, and the forecasts disagree. Those that model LNG feed gas directly see it lean: an S&P Global illustration implies about 8 barrels of condensate per MMcf, and a 2018 CERI study of LNG Canada and Kitimat LNG about 21. Reported Alberta’s average was 37 in 2025, double 2015’s; the AER’s forecast implies 58 for each extra MMcf; the best Montney wells make about 77. Estimate Some LNG gas will be rich: Shell’s purchase of ARC Resources was reported as securing Montney feed gas for LNG Canada. Reported We use the AER’s 58 as our central case. It is the richest published forecast we found, so it flatters what gas can do. Interpretation
How to read it → Bars: barrels of condensate per MMcf under each forecast; the gold box is our central case. Right-hand columns: the gas needed for 100 kb/d, and what one LNG Canada phase would bring at that yield.
Why it matters → Forecasts that model LNG feed gas directly are the leanest. Our central case uses the richest published forecast, so it flatters what gas can do.
Table 3 asks how much more gas demand Alberta would need once everything already planned is running, at the AER’s yield, Alberta’s average and the LNG-specific forecast. Estimate
| kb/d unless stated | Central: AER yield (58 bbl/MMcf) | Alberta average (37) | LNG-specific forecast (21) |
|---|---|---|---|
| Diluent to bring in with every oil export pipe full | 880 | 880 | 880 |
| − Condensate from the 5.6 Bcf/d of gas produced for new demand already counted | −323 | −207 | −118 |
| = Still to bring in | 557 | 673 | 762 |
| − What Alberta already brings in today | −357 | −357 | −357 |
| = New shortfall after those plants are running | 200 | 316 | 405 |
| More gas demand needed to cover it, Bcf/d | 3.5 | 8.6 | 19.1 |
| = LNG Canada-sized plants (1.85 Bcf/d each) | 1.9 | 4.6 | 10.3 |
On the AER’s yield, closing the gap with gas takes about two more LNG Canada-sized plants beyond Ksi Lisims, to borrow a framing from Richard Masson; at Alberta’s average, almost five; on the LNG-specific forecast, more than ten. Estimate LNG Canada’s second phase, an expansion of an existing site, was announced as a C$33 billion investment. Reported Two more of that size would mean C$65 billion or more. Estimate Gas cannot close this gap on its own: producers drill liquids-rich gas only when the gas itself has a buyer, so it takes new gas demand, such as LNG, to bring the condensate, not demand for diluent alone. Interpretation
Timing is the other catch. LNG Canada’s second phase, sanctioned in September, is due around 2031, with gas flowing a year earlier; a plant sanctioned in 2027 would start around 2032. Reported Most of the new pipe could run by 2030, so the bridge years fall on imports. Interpretation
The LNG market is the last test, and it cuts both ways. Today it is tight, not glutted: the IEA said on 3 November that the Gulf disruption could keep it tight into 2028, and four North American projects, LNG Canada’s second phase among them, were sanctioned after March. Reported But the supply wave due this decade has been delayed, not cancelled, and a plant sanctioned now would start in the early 2030s, as it lands. Buyers asked to sign 20-year contracts will price that in; Canada’s answer is a short route to Asia that passes no chokepoint (Article 51). Interpretation
How to read it → Each row is one project. The dot marks the start of service; the pale bar runs from investment decision or construction to service. Solid rows are approved or sanctioned; light rows are not.
Why it matters → Pipes fill with diluted bitumen as soon as they open. The largest gas demand arrives in the early 2030s, so the next five years fall on imports.
North America Has the Condensate. Alberta Needs the Route.
The US Gulf Coast has condensate to spare, and products pipelines already move it to the Chicago hubs. The bottleneck is the last 2,500 km into Alberta, where both import pipelines are full. Interpretation Seven options exist; none closes the gap on its own.
How to read it → Numbered markers match the key. Solid line: today’s import pipes, already full. Dashed red: rail. Dotted: pipe that does not exist yet. Colour shows cost relative to a pipeline toll.
Why it matters → Rail and diluent recovery are the only bridges before 2030; the cheap, large options are pipes that need contracts now.
Until new pipe opens, only rail can grow large. A 120-car unit train carries about 60,000 barrels, so every 100 kb/d means almost two trains a day, at roughly twice the cost of pipeline. Reported At the 2015 cost gap, that is about $0.2–0.5 billion a year more per 100 kb/d. Estimate Rail from the West Coast has been done, through a Kitimat terminal from 2006 that is now part of the LNG Canada site, and light condensate likely falls outside the north-coast tanker moratorium; a new terminal would be needed either way. Interpretation
Two smaller bridges keep diluent in Alberta. Diluent recovery at Hardisty strips it from blend and ships the heavier crude by rail. A splitter turns light crude into roughly a third diluent, a third jet-range fuel and a third heavier oil, so its economics rest on the jet fuel; a decade ago, the Burnaby refinery met only about 40% of Vancouver airport’s needs. Reported Butane offers little extra room: it is already blended up to pipeline vapour-pressure limits. Interpretation
The lasting fix is pipe, and the cheapest pipe already exists. Enbridge’s Southern Lights, the larger of the two import lines, added about 10% in 2025 with station work alone. Verified Enbridge planned to take it to 275 kb/d as early as 2013, and said in July that it “can be expanded with future production growth”. Reported That would add about 75 kb/d on an existing right-of-way: the fastest large step. Estimate Reversal is slower. Southern Lights is itself partly a reversed crude line, turned around in 2010 to carry diluent from Minnesota to Edmonton. Reported Doing the same with another Mainline line works only in sequence: space opens when export barrels move to new pipes, which on current plans means Pacific Link; rail carries the gap until then; and the conversion takes months of work and approvals. It is a 2030s option, not a bridge. Interpretation The third route is a return line beside a new export pipe: Northern Gateway was designed to carry 193 kb/d of condensate inland; Pacific Link, on current plans, has none. Reported Producers will sign for a northbound line if its toll beats rail, which at roughly half the cost it should, once enough of them commit together, and a return line is cheapest to add while Pacific Link is still being designed. No single option is enough; the gap will be closed by several at once, or not at all. Interpretation
Every route also has a headwind (Table 4). Pipe faces the fewest on cost and the most on contracts and permits. If none is built in time, the market rations diluent by price: rail sets the cost, growth slows, and that is the outcome that cuts royalties and leaves Pacific Link part-full. Interpretation
| Route | What could slow it | What would clear it |
|---|---|---|
| Expand Southern Lights | Shippers must sign before growth is certain; possible US cross-border approvals | The producers’ growth agreement, then an open season |
| New or reversed line north | 10- to 20-year contracts; permits on both sides of the border; a reversal waits for Pacific Link to free Mainline space | Producer contracts; Pacific Link in service |
| Return line with Pacific Link | Adds cost to a C$35–44 billion project; needs a coastal import terminal | A decision before the design is fixed |
| Rail | About twice the cost of pipe; railcars, unloading slots and labour disruptions | Price: rail is the market’s default |
| Diluent recovery and splitters | Rail for the heavier crude; buyers for jet fuel and heavy cuts; small scale | Gibson’s optional second phase; a refiner or airport offtaker |
| More LNG demand | 20-year buyers for plants starting in the 2030s, when the delayed supply wave lands; feed-gas pipe; emissions rules | Buyers paying for a short, chokepoint-free route |
For Pipes, Prices and Governments
The squeeze is measured in billions. Figure 8 puts the main numbers side by side. Estimate
How to read it → Left: annual flows at 2025 prices, Insight Stream estimates. Right: one-off capital, as reported. Colour: red for costs that grow as the pipes fill, gold for price effects, navy for public money.
Why it matters → A diluent shortfall of 100 kb/d strands about C$6 billion a year of bitumen. Even rail, the costliest bridge, adds only $0.2–0.5 billion a year for the same 100 kb/d.
Pipes are built on contracts but paid for by barrels. Trans Mountain and Prairie Connector are mostly contracted for 15 to 20 years; Enbridge’s Mainline has no contracts, so shippers nominate month to month (Table 5). Verified When a contracted pipe opens before production grows to fill it, its shippers will move barrels off the Mainline. Interpretation Under the settlement that runs to the end of 2028, each 50 kb/d lost raises the Mainline toll by US$0.035 a barrel for those that stay. Verified Only once Pacific Link flows could a Mainline line be spared and reversed to bring diluent in. Interpretation
| Pipeline | How its capacity is sold | Who carries the volume risk |
|---|---|---|
| Enbridge Mainline | Month-to-month nominations; contracting rejected by the CER in 2021 | Remaining shippers, through volume-adjusted tolls (settlement to end-2028) |
| Trans Mountain (federal Crown corporation) | About 80% under 15- and 20-year firm contracts | Contract shippers; the Crown as owner for the rest |
| Prairie Connector | 465 kb/d of 20-year commitments | Contract shippers and South Bow |
| Pacific Link (government-led) | Open season expected in spring 2027 | Shippers who sign; governments for the rest |
Governments carry the risk twice, and with them taxpayers. First through royalties: Alberta calculates oil sands royalties after diluent costs, and projects deducted C$29.7 billion of them in 2025. Verified Condensate cost about US$9.65 a barrel more than WCS in 2025 on Alberta’s reference prices; on our estimate that cost producers about C$3.8 billion and cut royalties by about C$0.9 billion, and every US$1 it widens costs producers about C$0.4 billion a year and Albertans about C$0.1 billion. Estimate Second, as owners: Ottawa spent about C$34 billion on Trans Mountain, and Pacific Link, at C$35–44 billion, is government-led. Reported If diluent limits growth, Pacific Link fills last, and every 100 kb/d of diluent that does not arrive strands about 230 kb/d of bitumen worth about C$6 billion a year. Estimate That is public money riding on a diluent plan that does not yet exist; our next article puts a full number on the bill. Interpretation
The shortage reaches well beyond the pipes. Table 6 sets out the direction for each market it touches.
| Market | Direction | Why |
|---|---|---|
| Condensate at Edmonton | ▲ Premium rises | The marginal barrel comes by rail; the posted price already runs at 95–98% of WTI |
| Liquids-rich drilling, Montney and Duvernay | ▲ Keeps growing | Condensate pays for the well; the gas still needs a buyer (Article 50) |
| AECO gas | ▼ Weaker until LNG demand arrives | Liquids drilling brings gas with it (Article 50); oil sands fuel demand is the offset |
| Propane and butane at Edmonton | ▼ Weaker prices | More supply: liquids-rich wells bring LPG too, and butane blending is capped, so more must be exported |
| Heavy crude and bitumen netbacks | ▼ Lower | Each barrel carries costlier diluent; royalties are paid after diluent costs |
| Synthetic crude | ▲ Worth more | Upgraded barrels need no diluent and can stand in for some |
| US Gulf Coast condensate and natural gasoline | ▲ More demand from Canada | More barrels move north, mostly by rail |
| Rail and terminals | ▲ New inbound flow | About 1.7 unit trains a day for every 100 kb/d |
| Jet fuel in Western Canada | ▲ More supply if splitters are built | A third of a split barrel is jet-range fuel |
Who Holds the Cards
The squeeze will not land evenly: a tighter diluent market costs some players, pays others, and only some can act on it (Figure 9). Interpretation
How to read it → Left to right: from those who pay more to those who gain. Bottom to top: from those with few levers to those who own a pipe, a supply or the contracts. Names are examples, not a ranking.
Why it matters → The fix needs a deal between the top two boxes: the companies that own pipe and supply, and the buyers whose contracts make it bankable.
Enbridge holds the fastest pipe fix. It owns Southern Lights and Norlite, which carries diluent to the oil sands. Southern Lights’ original 15-year contracts expired in June 2025, and its revenue fell afterwards. Reported A growth wave lets Enbridge re-contract and expand in one step, and a diluent line hedges its Mainline: barrels that leave for contracted export pipes still need diluent that Enbridge can carry in. Interpretation
Shell holds the biggest supply lever. It operates LNG Canada and in September completed its purchase of ARC Resources, which produced about 107,000 b/d of crude oil and condensate in 2025 with 1.3 Bcf/d of gas, about 80 barrels per MMcf. Reported That is equivalent to almost a fifth of Canada’s roughly 570,000 b/d of condensate, on Rystad’s estimate. Estimate How fast Shell develops liquids-rich Montney gas for LNG Canada will move Western Canada’s condensate supply more than any other single decision. Interpretation
Condensate is why the Montney is not for sale cheaply. Ovintiv bought Paramount’s Montney assets for about US$2.3 billion in early 2025 and agreed in November 2025 to buy NuVista for US$2.7 billion; Shell paid US$16.4 billion, including debt, for ARC. Reported Buyers are paying for liquids. A tighter diluent market raises the value of every condensate barrel whatever gas fetches, which is why liquids-rich producers keep drilling and keep their acreage. Interpretation
The companies closest to the problem are already moving. Gibson plans to add 50,000 b/d to its Hardisty diluent recovery unit from 2028, with an option for 50,000 more, within up to C$1 billion of growth capital over five years. Reported Keyera expanded Edmonton’s Alberta Diluent Terminal in 2008 to take more than 60,000 b/d of condensate from unit trains; CPKC links Hardisty and Port Arthur, Texas, on a single railway, and CN reaches the Gulf through its US network. Reported Rail and terminal owners gain most in the bridge years. Interpretation
The buyers pay, but hold the contracts. Much of the planned growth comes from SAGD producers such as Cenovus, which added about 110,000 b/d with its C$8.6 billion purchase of MEG in November 2025, ConocoPhillips and Strathcona. Reported Suncor and Canadian Natural, which upgrade much of their output, are partly hedged: synthetic crude needs no diluent. Interpretation The buyers’ 10- to 20-year contracts are what make a new diluent pipe bankable, and whoever signs first sets the terms. Interpretation
How it lines up. Governments have the fewest quick levers, but Alberta has underwritten pipes before, losing about C$1.3 billion when Keystone XL was cancelled in 2021. Reported The interests point to one deal: SAGD producers sign long contracts, Enbridge expands Southern Lights or builds beside it, and Alberta, whose royalties fall as diluent costs rise, has reason to underwrite part of the bridge. Shell’s Montney pace and the next LNG decisions set its size. The producers’ growth agreement with Ottawa and Alberta is the natural place to strike it, yet nothing reported so far puts diluent on its agenda. Interpretation
What We Expect, and What Would Prove Us Wrong
These are our calls, and what would prove us wrong.
| Our call | By | What would prove us wrong |
|---|---|---|
| Enbridge moves first: an open season to expand Southern Lights, or to build a diluent line beside it, once producers sign their growth agreement | 2027 | No open season by the end of 2027, or the growth agreement stalls |
| Rail carries the 2029 peak, and Edmonton condensate moves from 95–98% of WTI towards parity or a premium | 2028–29 | Growth on the AER’s slower path, or new import pipe before 2029 |
| No Mainline line is reversed for diluent before Pacific Link flows | Early 2030s | A reversal application before Pacific Link is sanctioned |
| Pacific Link’s open season carries no diluent return line unless governments require one | Spring 2027 | Return-line or import terms in the open season |
| No LNG plant beyond Ksi Lisims is sanctioned before 2028, so the roughly 200 kb/d left after Ksi Lisims stays open into the 2030s | 2028 | Another LNG Canada-sized decision by 2028; each covers about half the remaining gap on the AER’s yield |
| Diluent recovery grows first: Gibson sanctions the optional second 50 kb/d phase at Hardisty | By 2028 | The option lapses, or rail capacity for the stripped bitumen is not secured |
Three dates will test the balance itself: Ksi Lisims’s investment decision, targeted by the end of 2026 (without it the gap is 90–120 kb/d larger); Prairie Connector’s, targeted for mid-2027; and the AER’s next outlook, due mid-2027, which will show whether the regulator counts the new pipes.
How to read it → Rows are the players; columns are the time windows. Read across a row for one player’s path.
Why it matters → The decisions that matter most, contracts and a return line, have to be made before the pipes fill.
Canada is debating how to get more oil out of Alberta; the diluent that has to come in is barely part of that debate. Every oil export pipe is also a diluent import requirement, and the gas that could supply the diluent arrives later and only if it is rich. Planning the route in now is cheaper than discovering the shortage when the pipes fill.